2024欧洲杯下注平台 > Discipline inspection and supervision 

Zhang Xinhua, secretary of the Discipline Inspection Committee of the Group company, investigated the S320 highway toll station project along the river

Source: Shanghai Trading Group Release Time: 2021-11-23 Visits:

  On November 19, Zhang Xinhua, member of the Party Committee and secretary of the Commission for Discipline Inspection of the Group company, led a team to the tollgate along the river to investigate the construction of tollgates and ancillary facilities engineering projects, and Fan Meixia, member of the Party Committee and deputy general manager, participated in the research。

  At the project site, Zhang Xinhua listened to the report of the resident project management person on project quality, construction safety and construction progress, and went into the construction line to inspect the progress of the project construction。

  Zhang Xinhua pointed out that all relevant departments should establish the overall concept, enhance the awareness of active service, strengthen coordination and cooperation, and form a joint work force。It is necessary to attach great importance to construction safety and personnel protection safety, and strictly implement the rules and regulations of project construction site safety production。It is necessary to combine epidemic prevention and control with construction and production, earnestly implement all epidemic prevention and control policies and regular epidemic prevention and control measures, and earnestly protect the health and life safety of construction workers。

  Zhang Xinhua stressed that it is necessary to further enhance the sense of responsibility and sense of urgency, take the initiative to docking and coordination, establish a list of problems, and do everything possible to solve the practical problems encountered in the construction of the project。It is necessary to strengthen overall planning and scheduling, rationally arrange the construction period, seize the golden period of construction, and keep an eye on the target and seize the progress under the premise of ensuring quality and safety to ensure the early completion of the project。