2024欧洲杯下注平台 > News center

  On December 28, the emergency work leading group of the Group company sounded the "low temperature rain and snow freezing disaster" Baochang Baotong assembly number and held an emergency thematic work meeting。Combined with the G347 first-class highway (Pujiwei to Zongyang section), the G236 Qingtong River Bridge project, the S320 first-class highway toll station project and other important traffic arteries, the conference fully deployed the work of ensuring the smooth and smooth。

                        The leaders of the emergency work leading group led the patrol of roads and Bridges

  First, we will strengthen material support。Deploy 10 snow plows, 6 transport vehicles, 2 emergency command vehicles, organize 50 snow workers on standby, equipped with 15 tons of snow melting agent, 60 warning cans and other related materials, to ensure that "material reserves are in place, machinery is on standby", to rain and snow as the order, to the weather, troops and horses have not arrived, food and grass first。

                                G347 toll station LED warning information roll

  The second is to strengthen the investigation of hidden dangers。Closely focusing on the core goal of "controlling major accidents and preventing major disasters", we have earnestly formulated early warning and emergency response plans, implemented a 24-hour duty and leadership shift system, and assigned special personnel to supervise key sections and large Bridges in real time to ensure smooth road decks and the safety of personnel and vehicles。Strengthen the anti-slip and anti-freeze management of the construction site, standardize the outdoor work of construction, strictly prohibit the forced organization of construction in bad weather, effectively take anti-freeze and anti-slip measures on the construction site, outdoor workers strictly use anti-slip shoes, protective gloves and other protective equipment, and strictly prevent production safety accidents caused by extreme weather。

                                G236 Snow melting agent applied to Qingtong River Bridge

  Third, strengthen emergency duty and information reporting。Tanggou toll station entrance and exit LED screen real-time rolling road condition information, warning information, timely remind passing vehicles, reduce speed, slow passage。Strengthen the verification and reporting of accident disaster information, resolutely put an end to missing, delayed and hidden reports, ensure that information channels are smooth and accurate, and can deal with emergencies in the first time。In case of sudden traffic accidents, timely report the accident, ensure unified action, rapid response, timely cooperate with the traffic police department and road administration department to do on-site traffic maintenance, roadblock clearing, and traffic recovery。