2024欧洲杯下注平台 > News center

  On the morning of September 16, with the pouring of the last concrete, the G236 Qingtong River Bridge completed the whole bridge closure and realized the whole bridge through, laying a solid foundation for the full opening to traffic and the completion of the project at the end of the year。Peng Wenji, deputy director of the Chizhou Municipal Transportation Bureau, Pei Jue, director of the Municipal Highway Management Service Center, Tang Shicai, Chief engineer Zhang Yelai, and Zhang Xin, Party committee member and secretary of the Provincial Road Port Engineering Co., LTD., attended the closing ceremony and jointly launched the bridge closing construction。

  G236 Qingtonghe Bridge Reconstruction project is located at the junction of Tongling and Chizhou. It is an original road reconstruction project with a total length of 2 Bridges and leads.165 km, design speed 80 km/h, the total investment of the project is about 2.3亿元。Among them, the Qingtong River Bridge is 667 meters long。After the reconstruction, the bridge is divided into left and right two-way 6 lanes, with an overall width of 32 meters。

  The project has been under construction since March 2020,Under the strong support of the municipal Party committees and municipal governments of the two cities and the relevant departments directly under the city, and the common concern of all sectors of society,Tongling project team has always adhered to the concept of "high standards, high quality and high efficiency",We have actively overcome a series of difficulties such as the COVID-19 epidemic, high temperature, drought, floods, and relocation work,Go all out to overcome difficulties and promote project construction,With the spirit state of never slack and the attitude of indomitable struggle, it sang a magnificent construction battle song。

  The closure of Qingtong River Bridge means that it is only one step away from the completion and opening of the bridge, and the next step will be the bridge deck paving and bridge deck construction, and strive to achieve the completion and opening of the bridge by the end of the year。After the bridge is completed and put into use, it will greatly improve the traffic capacity of Bridges and highways, give full play to the scale effect and overall effect of the road network, further promote the economic and cultural exchanges between the two cities, and promote the social and economic development of Wanjiang City belt。