2024欧洲杯下注平台 > News center

  On June 27, Long Daoning, deputy secretary of the Party Committee and general manager of the Group company, went to the site of the Tongling River North Port Railway special line project to conduct field research。Group company chief engineer, Jiangbei Port railway special line company chairman, general manager Zhang Yelai accompanied the investigation。

  During the investigation, Long Daoning first arrived at the subgrade section of Fanshan Station and the construction site of Liuhewan Super Bridge of the project to observe the construction progress and understand the difficulties and problems existing in the current promotion of the project in detail。

  Subsequently, Long Daoning carefully listened to the basic situation of the company, the main work and the next work arrangement and other reports。

  He pointed out that the Jiangbei Port railway special line project is a joint venture project of Hefei and Tongling, and the completion of the project is of great significance to creating a copper development belt, accelerating the coordinated development of regional economy, strengthening the interconnectivity of the Yangtze River Delta, and building a modern comprehensive transportation system。

  He required that we should promote the establishment of a high-level coordination mechanism, play a linkage role, and accelerate the speed of solving the problem of land expropriation and demolition。It is necessary to seize the opportunity to build a large logistics system in Hefei City and plan railway operation with a more proactive attitude。It is necessary to comprehensively clarify the relevant costs of Lujiang South Railway Station integration construction, and fully promote the commissioning work of integration station。It is necessary to strengthen the safety and quality control of the construction site, implement the safety production responsibility system and the quality responsibility system, and comprehensively improve the quality and efficiency。