2024欧洲杯下注平台 > Public announcement

  1. Bidding conditions

  1.Project name: Section I: G330 Tongling Section I highway reconstruction project (Phase I Qianpu section) construction drawing consultation;Second bid: G236 Qingtong River Bridge construction project construction drawing consultation。

  2.Tenderer: Tongling Comprehensive Transportation Investment Group Co., LTD

  3.Nature of the transaction: Highway design consulting

  Ii. Project overview and bidding scope

  1.Section 1: Construction scale: The total length of the route is about 9.1 km, general section roadbed width 25.5 meters, municipal subgrade width 33.1 meter, the investment is about 5.16亿元。The bid control price is 120,000 yuan。

  Second bid section: Construction scale: the total length is about 2.159 kilometers, 32 meters wide roadbed, 660 meters /1 bridge, complete traffic safety, management and other facilities, the project investment of about 2.30亿元。The bid control price is 150,000 yuan。

  2.Section 1: Planned construction period: 7 calendar days;Phase II: Planned construction period: 7 calendar days。

  3.Section I: Scope of bidding: G330 Tongling Section I highway reconstruction project (Phase I Qianpu section) construction drawing review and structural safety and stability recalculation, and issue a formal consulting report。

  Bidding scope: G236 Qingtong River Bridge construction project construction drawing review and structural safety and stability recalculation, and issue a formal consulting report。

  3. Bidder qualification requirements

  1.Bidder qualification requirements:

  (1) The bidding unit is the small storage enterprise of Tongling Comprehensive Transportation Investment Group Co., LTD。

  (2) Enterprise qualification: Grade A qualification of highway design。

  (3) Personnel requirements: with highway engineering professional senior engineer and above titles。

  2.Subject to the administrative penalty imposed by the competent department of bidding and tendering, bidders or project managers who remain within the penalty period until the deadline of bidding shall not participate in bidding。

  3.Bidders with any of the following bad behavior records shall not participate in the bidding:

  (1) The cumulative score of bad behavior recorded by the Tongling City and county (district) public resources trading supervision department is between 10 points (inclusive) and 15 points (exclusive), and the date of publication of the latest bad behavior record is not more than 6 months from the bid opening date;

  (2) The accumulated score of the bad behavior record recorded by the Tongling City and county (district) public resources trading supervision department is 15 points (inclusive) -20 points (exclusive), and the date of publication of the latest bad behavior record is not more than 12 months from the bid opening date;

  (3) The accumulated score of the bad behavior record recorded by the Tongling city and county (district) public resources trading supervision department is more than 20 points (inclusive), and the date of the latest bad behavior record announcement is not more than 24 months from the bid opening date。

  The score of the above bad behavior record shall be consulted by the tenderer or agency in the credit information column of the Tongling Public Resources Trading Supervision Administration website at the bid opening site, and the specific score and other information shall be subject to the Summary Table of the score of the bad behavior record of the market competitors in Tongling City (including counties and districts) on the day of the bid opening。

  4.The bidder or the proposed project manager (project leader) who is listed as the person subject to enforcement for breach of trust by the people's court shall not be recommended as the candidate for winning the bid。

  5.The bidder or the proposed project manager (project leader) who has been listed in the criminal record of bribery by the People's Procuratorate within the past three years shall not be identified as the winning bidder。

  4. How to obtain bidding documents

  From April 2, 2019 to April 4, 2019 (working hours), bring the power of attorney to the 11th floor Engineering Department of Tongling Comprehensive Transportation Investment Group Co., Ltd. to register and receive the bidding documents。

  V. Deadline for submission of bid response documents and bid opening time: 10:00pm, April 9, 2019。

  Place of submission of tender documents and place of bid opening: Tongling Comprehensive Transportation Investment Group Co., LTD. Engineering Department。

  6. Contact Information:

  Tenderer: Tongling Comprehensive Transportation Investment Group Co., LTD

  Contact: Kong Yun

  Contact number: 0562-2801556